logo and header textContact telephone, mobile and email

Gallery

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Bathroom before utility and tile fitBathroom after utility and tile fit

Bathroom

Project: Bathroom - Full re-fit.

Customer: T. Smith. Washington Village.

Old Bathroom decor with shower before new installshower and concertina screen

Bathroom before new installation showing old radiator and tired looking decorBathroom after new refit

This project was a full bathroom installation, supply and fit.

Work carried out by Durham Tiling included:

* Removal of old existing tiles and wall and floor coverings.

* Removal of existing bathroom suite, shower, and radiator.

* Plastering services, re-boarding and skimming.

* New bathroom utility re-fit, Bath, Toilet, sink shower and chrome towel radiator, basically everything in the bathroom.

* Tiling was supply and fit of all wall and floor tiling, grouting and polishing.

* New ceiling covering and electrics.

* Removal and transport of old bathroom suite and rubble etc.

 

 CTD logo Tile Giant Logo