Bathroom
Project: Bathroom - Full re-fit.
Customer: T. Smith. Washington Village.
This project was a full bathroom installation, supply and fit.
Work carried out by Durham Tiling included:
* Removal of old existing tiles and wall and floor coverings.
* Removal of existing bathroom suite, shower, and radiator.
* Plastering services, re-boarding and skimming.
* New bathroom utility re-fit, Bath, Toilet, sink shower and chrome towel radiator, basically everything in the bathroom.
* Tiling was supply and fit of all wall and floor tiling, grouting and polishing.
* New ceiling covering and electrics.
* Removal and transport of old bathroom suite and rubble etc.